Tent Permit Plans for San Francisco (SFFD)

Planning a tented event in San Francisco? Here's what the San Francisco Fire Department (SFFD) typically asks for, and how we can help you get there faster.

Do I need a permit?

Most tents over 200–400 sq ft need an SFFD permit. Open-sided tents are exempt only if each is 700 sq ft or less, multiple tents total 700 sq ft or less without a 12 ft fire break, and there's 12 ft clearance to structures and other tents. SFFD uses one combined construction/operational permit. Tents over 400 sq ft also need proof of liability insurance.

What SFFD asks for

Cooking under or near the tent

Cooking tents are 20 ft from other tents. A CSFM flame-resistance certificate is submitted and kept on site, and NO SMOKING signs are posted (SFFD bulletin 5.10).

How the process works

  1. Apply in person at the SF Permit Center, Bureau of Fire Prevention, 49 South Van Ness, 2nd floor, at least 5 business days ahead. Late filings may be charged overtime.
  2. Larger structures may need an engineer's inspection letter.

How long does review take?

SFFD doesn't publish a set review time, so apply well ahead; SFFD's minimum is 5 business days. Fees are set by SFFD's current schedule.

Code basis

2025 San Francisco Fire Code, Chapters 1, 10 and 31.

We prepare PE-stamped tent plan sets built for SFFD review. Draw your tent layout on the aerial map, and we'll send you a draft preview with the exact price before you pay.

Source: SFFD tent submittal requirements. Requirements can change, so confirm with SFFD before your event.